Summary

The new 36,000 SF seven-bay, drive through fire station features a firefighter training room, exercise room, day lit apparatus room, and dorm space. MEP provided HVAC, Electrical, Plumbing, and Fire Protection engineering design services throughout the construction period. The new facility is being designed to self-perform following LEED sustainable design standards.

Type
New Facility

Size
36,000 SF

Status
Completed 2015